Increase in traction performance of TSS Ústí u Vsetína
Client: SŽDC, s.o.
Investor: SŽDC, s.o.
Technical data, description:
Complete reconstruction of the construction and technology part of a traction converter station. The technology of the 110 kV substation was reconstructed, installation of 110/22 kV traction transformer stalls, reconstruction of 22 kV substation (cabinet), traction transformers and rectifiers, and 3 kV DC substation (both in cabinet design). The technology also included reconstruction of 6 kV substation, own consumption, and reconstruction of supervisory system technology. The construction part was carried out in the form of a partial reconstruction of the existing buildings. The project also included a reconstruction of supply and return lines, outside lines – low/high-voltage, and reconstruction of outside earthing. During the reconstruction, power supply was ensured via the contractor’s mobile converter station. Furthermore, the project also included the preparation and discussion of detail design project documentation.
Total investment costs: CZK 181 010 683 (excl. VAT)
Realization date: V/2015 – X/2015