Increase in traction performance of TSS Valašské Meziříčí
Client: SŽDC, s.o.
Investor: SŽDC, s.o.
Technical data, description:
Complete reconstruction of the construction and technology part of a traction converter station. Newly installed 22 kV substation (cabinet), traction transformers and rectifiers, and 3 kV DC substation (both in cabinet design). The technology also included reconstruction of 6 kV substation, own consumption, and supervisory system technology. The construction part was carried out in the form of a partial reconstruction of the existing buildings. The project also included a reconstruction of supply and return lines, outside lines of low/high-voltage, and reconstruction of outside earthing. Furthermore, the project also included the preparation and discussion of detail design project documentation.
Total investment costs: CZK 178 805 897 (excl. VAT)
Realization date: V/2015 – X/2015