Investor: Dopravní podnik měst Liberce a Jablonce nad Nisou a. s.
Customer: EUROVIA CS a.s.
Technical Data, Description:
After a demolition of Textilana object a reconstruction of a tram line was realized with the aim to „straighten“ the curve near Textilana, to double the track and to make the extension for two gauges. The rails lie on „Y“ sleepers. EŽ Delivery: complete contact line OCS incl. civil works, foundations and masts, cable line and heating of platforms at tram stops. Contact line is catenary type with anchor by weight situated in HEB masts. Contact wire is Cu 120 mm2 carrying rope is Cu 120 mm2 and Cu 95 mm2 suspended on fiberglass cantilevers. The masts are octagonal, with flange. Because of the minimum distance of the rail axes, the masts have been designed to enable a position regulation. Total length of the contact wire is 2 100 m.
Feeders and return cables are partially laid in a multichannel, total length of 3 AYKCY 1×500 mm2 cable is 7 600 m.
Heating of stop platforms at Textilana is designed with a switchboard located on the ground, the switchboard for heating platform at U rybníčku stop is located on a mast and ensures heating of both areas.
Total Investment cost: CZK 15 779 000,- (excl. VAT)
Realized in: 3/2011 – 9/2011