Optimization of Railway Line Beroun – Zbiroh
Client: SKANSKA DS, a.s.
Investor: SŽDC, s.o., SS Plzeň
Technical data, description:
Reconstruction of overhead contact lines for the 25 kV/ 50Hz AC system, reconstruction of the construction and technology part of the switching station Osek – 27 kV –27 kV substation (cabinet), own consumption, supply and return lines, reconstruction of heavy current lines, outside lighting, remote control of section disconnectors, installation of electric heating of switches, supervisory system technology (Supervisory Systems with automatic equipment TECO) and distribution transformer station (low/high-voltage).
Total investment costs: CZK 350 956 773 (excl. VAT)
Realization date: X/2008 – IV/2012