Optimization of Railway Line Zbiroh – Rokycany
Client: Sdružení SKANSKA a.s., EUROVIA CS a.s, SUBTERRA a.s.
Investor: SŽDC s.o., SS Plzeň
Technical data, description:
Complete reconstruction of overhead contact lines for the 25 kV/ 50Hz AC system, reconstruction of the technology for the traction transformer station 110/27kV Mýto, including 110 kV substation technology, 110/27 kV traction transformers, 27 kV substation (cabinet) of the filtration/compensation equipment and own consumption, reconstruction of heavy current lines, outside lighting, remote control of section disconnectors, installation of electric heating of switches, supervisory system technology (ZAT technology with SAIA automatic equipment) and distribution transformer station (low/high-voltage) 22/0.4 kV – internal design.
Total investment costs: EUR 16 815 370 (excl. VAT)
Realization date: VI/2009 – VII/2012