Szeged, Hungary – Tram Line No. 2
Investor: Szeged city
Customer: Consorcium of OHL, Kozopszolg
Technical Data, Description:
New tram line in Szeged cca 2 000 m long, double track + loop – open superstructure with partially grassed surface. In the frames of the project a complete reconstruction of 2 crossings with TBUS lines was performed. EŽ Praha a.s. delivered masts and complete overhead contact line. The contact line is simple, with fixed anchorage, with auxiliary wire, suspended partially on headspans, partially on fiberglass cantilevers. Technological complexes of the trolleybus part – switches and crossings – are in „tension variant“, for the crossing of tram and tbus lines crosses enabling the passage on „alive“ line were used. Totally 3 pcs of electrical, remote controlled switches, 14 pcs of tbus x tram crossings were delivered. Contact wire is Cu 100 mm2, total length 6 500 m.
Total Investment cost: CZK 19 470 000,- (excl. VAT)
Realized in: 5/2010 – 8/2011