Technical Data, Description:
The main goal of the project was to replace bus transport with an emission-free trolleybus. A total of 101 + 18 new traction masts were built and 5215 m + 1045 m of new catenary tracks (Cu 100 mm2) were installed.
The traction line is simple, flexible and uncompensated. 4 + 1 electric switches, 4 + 1 mechanical switches and 5 + 2 trolleybus crossings were installed as part of the construction.
Total Investment cost: CZK 41 331 250,66 (excl. VAT)
Realized in: 9/2021 – 4/2022